Overview

Framework:
RQF
Level:
Level 3
Unit No:
H/617/1496
Credits:
7
Guided learning hours:
30 hours

Assessment Guidance

Learning Outcome 1:

Produce a set of working construction drawings and a landscape plan. A set of working plans a range of construction drawings will also be completed

Learning Outcome 2:

Learners will develop a detailed Scheme of work and compile both generic risk assessments and task specific risk assessments for all aspects of preparation and build.

Learning Outcome 3:

Complete all the tasks required in the construction of the show garden complying with health and safety regulations and risk assessment findings.

Learning Outcome 4:

Learners will create an illustrated online blog that details the process of creating a show garden from design plan through to build completion and add personal reflection of their own and peers performance. Produce a summary evaluation of the project with recommendations.

Aim

The learner will use project management skills to plan and deliver a team garden show build , develop construction drawings, resourcing of materials, site safety and evaluate the project . There is an expectation that learners will gain industry experience prior to completing this unit.

For the full unit details, please download the latest version of the qualification specification. This is available for download on the relevant qualifications page.

Unit Learning Outcomes

To view the assessment criteria and any additional content, please expand the relevant learning outcome below.

1. — Be able to use the garden design plan and develop a set of construction drawings.

Garden Design Plan
• analysis of scale and dimensions
• select media for construction drawings
• CADD software
• CADD library
• drawing production
• annotation key

• hard soft copy distribution

Assessment Criteria

  • 1.1

    Analyse garden design plan and compile a set of hard landscape plans and construction drawings of key features within the show garden.

2. — Be able to use their project management skillsto plan and deliver a show garden build.

Gantt Chart
• activities
• sequencing
• duration
• time line production

Scheme of Work
• tasks and activities
• resources required, labour, plant, materials
• subcontract works
• durations from time line
• company template and logo

Risk Assessments
• identify the hazards, principal
• who might be harmed, workers, public
• severity
• risk
• risk rating
• control measures

• revisions

Assessment Criteria

  • 2.1

    Create a time-line of key tasks.

  • 2.2

    Develop a detailed scheme of works to include costs and budget.

  • 2.3

    Compile generic and specific risk assessments.

3. — Manage the construction of a garden show build.

Resource sourcing
• analysis of long delivery periods on materials
• requisition scheduling
• purchase orders
• call off schedule
• delivery addresses
• labour scheduling
• plant acquisition and ordering
• waste management

Personnel Management
• hiring of direct labour
• short term contracts
• labour only subcontracts
• subcontractor enquiries
• employment law
• employment benefits

Quality Standards
• specification from client
• garden design drawings
• construction drawings
• British Standards
• European Standards
• Landscape Approved Codes of Practice
• Client inspection

Assessment Criteria

  • 3.1

    Source and organise all materials and equipment including tools.

  • 3.2

    Manage personnel in the planning and construction stages.

  • 3.3

    Complete the construction to specified standard within the given time frame and budget.

4. — Record the process and evaluate the success of the project.

Assessment Criteria

  • 4.1

    Compile a digital record of all stages of the project from the beginning to the completion.

  • 4.2

    Evaluate the project and make recommendations for improved ways of working.