Overview

Framework:
RQF
Level:
Level 2
Unit No:
D/618/3324
Credits:
3
Guided learning hours:
30 hours

For the full unit details, please download the latest version of the qualification specification. This is available for download on the relevant qualifications page.

Unit Learning Outcomes

To view the assessment criteria and any additional content, please expand the relevant learning outcome below.

1 — Be able to install lighting circuits.

Drawn information

  •  demonstrate following cable routes
  •  define cable colouring on diagrams
  •  know live, neutral and earth cables

Two way switching

  • draw out a switching diagram for first and ground floor hall lighting
  • draw out a switching diagram for single pole lighting circuit covering both:

                         - lighting circuits via ceiling rose         

                         - lighting circuits via junction boxes

Assessment Criteria

  • 1.1

    Describe how to follow circuit and wiring diagrams for lighting circuits.

  • 1.2

    Demonstrate how to install one-way and two-way lighting circuits.

2 — Be able to install power circuits. 

Demonstrate skills in

  •  following circuit diagrams provided for final ring circuits
  •  installation of a final ring circuit
  •  installation of a radial circuit to an appliance e.g. cooker, fire

Assessment Criteria

  • 2.1

    Describe how to follow circuit and wiring diagrams for power circuits.

  • 2.2

    Demonstrate how to install radial and simple final ring main circuits.

3 — Know the components of a heating control system.

Demonstrate central heating controls

  •  wiring of thermostats
  •  wiring of outside sensors
  •  wiring to boiler controls with switched fused spur

Assessment Criteria

  • 3.1

    Describe the basic components of a heating control system.

4 — Be able to terminate aerial plugs, telephone plugs and sockets.

Demonstrate communication wiring

  •  wiring of a satellite cable to a terminal socket
  •  wiring of a telephone line to a terminal socket
  •  wiring of an Ethernet cable to a socket

Assessment Criteria

  • 4.1

    Demonstrate how to terminate coaxial satellite cable leading into plugs and sockets.

  • 4.2

    Demonstrate how to terminate telephone / broadband cable leading into plugs and sockets.

5 — Be able to carry out continuity tests.

Demonstrate testing wiring

  •  test a power circuit
  •  earthing test
  •  test broadband and telephone lines

Assessment Criteria

  • 5.1

    Demonstrate how to test a circuit.

  • 5.2

    Demonstrate how to test an earth.

  • 5.3

    Demonstrate how to test a satellite feed and telephone line.