Employability and Enterprise

Agriculture, Environment & Animal Care

Vocational Qualifications

Catering, Hospitality & Leisure

Vocational Qualifications

Childcare & Education

Access to HE
Apprenticeships
Pre-Access to HE
Vocational Qualifications

Construction, Engineering & Manufacturing

Access to HE
Vocational Qualifications

Creative, Design & Digital

Access to HE
Vocational Qualifications

Education & Training

Professional Development

Hair & Beauty

Vocational Qualifications

Health, Science & Social Care

Access to HE
Apprenticeships
Pre-Access to HE
Vocational Qualifications

Life Skills & Progression

Personal & Social Development

Personal and Professional Development

Personal & Social Development
Professional Development
Vocational Qualifications

Public & Protective Services

Access to HE
Vocational Qualifications

Safeguarding & Wellbeing

Supporting SEND

Personal & Social Development
Professional Development

Transport & Logistics

Access to HE
Vocational Qualifications

Overview

Framework:
RQF
Level:
Entry Level 3
Unit No:
D/505/1377
Credits:
3
Guided learning hours:
30 hours

Assessment Guidance

Portfolio of Evidence

Unit Learning Outcomes

1

Know about the tools and equipment used for cutting and jointing plastic soil and waste pipe.

Assessment Criteria

  • 1.1
    Identify key plumbing hand tools used for cutting and jointing plastic soil and waste pipe.
  • 1.2
    Give examples of safe practice in using key tools.
  • 1.3
    State how to maintain key tools.

2

Know about plastic soil and waste pipe used in basic plumbing systems.

Assessment Criteria

  • 2.1
    Give examples of common plumbing installations where soil and waste pipe are used.
  • 2.2
    Give examples of plumbing installations where push-fit fittings are used.

3

Be able to produce pipework assemblies in plastic soil and waste pipe.

Assessment Criteria

  • 3.1
    Use appropriate hand tools safely.
  • 3.2
    Follow instructions to cut and joint pipes.
  • 3.3
    Fabricate simple pipework assemblies from a given plan.
  • 3.4
    Test the completed pipework assemblies for water tightness.

4

Be able to work safely.

Assessment Criteria

  • 4.1
    Clean and store tools in line with craft practice.
  • 4.2
    Leave work area clean and free from debris.
  • 4.3
    Dispose of/recycle waste as appropriate.

Offer this Unit

If you would like to offer this unit, you can book a meeting with us to discuss the best options.